ATBC 1160 - Construction - Cost Estimating Credits: 2.00 (2 contact hrs) A study of methods and procedures that are currently used to perform a construction estimate. Course includes examination of plans and specifications, outlining of material takeoff methods, and labor pricing schedules. South Campus.
Pre & Co Requisite(s): Prerequisite: ATBC-1150 or ATBC-1100 OUTCOMES AND OBJECTIVES Outcomes: Upon completion of this course, the student will be able to:
Objectives:
- Determine costs involved in building site excavation.
- Estimate and compare the cost of various foundations.
- Determine the cost of a roof.
- Estimate cost of installing plumbing in a building.
COMMON DEGREE OUTCOMES (Bulleted outcomes apply to the course)
- 1. The graduate can integrate the knowledge and technological skills necessary to be a successful learner.
|
- 2. The graduate can demonstrate how to think competently.
|
- 3. The graduate can demonstrate how to employ mathematical knowledge.
|
- The graduate can demonstrate how to communicate competently.
|
- The graduate is sensitive to issues relating to a diverse, global society.
|
COURSE CONTENT OUTLINE
- Introduction to the Course
- Residential Square Foot Cost
- Site work / Site Construction
- Foundations / Concrete and Masonry
- Framing / Wood and Plastics
- Exterior Walls / Metal
- Roofing / Thermal and Moisture Protection
- Interiors / Doors and Windows
- Specialties / Specialties and Equipment
- Mechanical / Mechanical
- Electrical / Electrical
- Special Construction / Conveying Systems
- Reference Section
Primary Faculty Grant, Janice Secondary Faculty Associate Dean Pawlowski, Timothy