|
Apr 25, 2024
|
|
|
|
CLCT 2400 - Air Conditioning 2 Credit Hours: 3.00 Prerequisites: CLCT 1400, CLCT 1650, and CLCT 1750; or related work experience
Commercial systems: application, installation, piping and service. Includes heat pumps, absorption and centrifugal equipment, testing and balancing of systems.
Location: South Campus
Contact Hours: 4 Billable Contact Hours: 4 OUTCOMES AND OBJECTIVES Outcome I: Upon completion of this course, students will install basic commercial, industrial, and institutional air conditioning systems according to the manufacturers’ literature.
Objectives:
- Install commercial air conditioning system.
- Install industrial air conditioning system.
- Install institutional air conditioning system.
Outcome II: Upon completion of this course, students will troubleshoot and repair basic commercial, industrial, and institutional air conditioning systems according to the manufacturers’ literature.
Objectives:
- Troubleshoot commercial systems.
- Troubleshoot industrial systems.
- Troubleshoot institutional systems.
Outcome III: Upon completion of this course, students will balance the air system for commercial, industrial, and institutional air conditioning systems according to the manufacturers’ literature.
Objectives:
- Balance air system for commercial systems.
- Balance air system for industrial systems.
- Balance air system for institutional systems.
COMMON DEGREE OUTCOMES (Bulleted outcomes apply to the course)
- 1. The graduate can integrate the knowledge and technological skills necessary to be a successful learner.
|
- 2. The graduate can demonstrate how to think competently.
|
- 3. The graduate can demonstrate how to employ mathematical knowledge.
|
- 4. The graduate can demonstrate how to communicate competently.
|
- 5. The graduate is sensitive to issues relating to a diverse, global society.
|
COURSE CONTENT OUTLINE Week Subject
- Introduction, The Service Tech: Who is he? What is his job?
- Air Conditioning Systems
- Heat Pump Systems
- Fans
- Air F low/Air Measurement
- Head & Suction Pressures. Superheat and Subcooling Lubrication.
- Compressors/Compressor Failures and Replacement Compressor Temperature
- MID-TERM
- Critical Charging and A/C Refrigeration Analysis
- A/C Refrigeration Analysis
- Psychrometrics
- VAV Systems
- Zone Systems
- Centrifugal Equipment and Cooling Towers
- Absorption Systems Principles, Application, Trane Absorption Refr.
- FINAL EXAM
Primary Faculty Marlow, Douglas Secondary Faculty Associate Dean Pawlowski, Timothy Dean Hutchison, Donald
Official Course Syllabus - Macomb Community College, 14500 E 12 Mile Road, Warren, MI 48088
Add to Favorites (opens a new window)
|
|